Project Overview
Türkiye İş Bankası A.Ş. The Data Center Project implemented in line with high security, uninterrupted operation, and advanced technology requirements has been successfully completed on a turnkey basis, including infrastructure, civil, architectural, mechanical, and electrical installation works.
Category
Client
Türkiye İş Bankası A.Ş.
Project Area
14.000 m2
Start Date
Mar 21, 2016
Finish Date
Feb 12, 2017




Türkiye İş Bankası Data Center
Türkiye İş Bankası A.Ş. The Data Center Project implemented in line with high security, uninterrupted operation, and advanced technology requirements has been successfully completed on a turnkey basis, including infrastructure, civil, architectural, mechanical, and electrical installation works.
Employer: Türkiye İş Bankası A.Ş.
Project Description: Data Center
Location:
Scope of Work: Turnkey; Infrastructure, Civil, Architectural, Electrical and Mechanical Installation
Structural System: Data Centers: Structural Steel / Administrative Building: Reinforced Concrete
Total Enclosed Area: 14,000 m²
Start Date: March 2016
Completion Date: February 2017
Design: Red Engineering
Türkiye İş Bankası Data Center Project | Turnkey Project
Türkiye İş Bankası A.Ş. The Data Center Project implemented in line with high security, uninterrupted operation, and advanced technology requirements has been successfully completed on a turnkey basis, including infrastructure, civil, architectural, mechanical, and electrical installation works.
In the project with a total enclosed area of 14,000 m², a structural steel system was used for the data center buildings, while a reinforced concrete structural system was applied for the administrative building. The facility was designed and constructed with consideration for energy continuity, HVAC performance, and operational efficiency criteria.
The project was completed between March 2016 – February 2017, in accordance with the planned schedule and quality standards. The design works were prepared by Red Engineering. Throughout the project, detailed photographs, Revit 3D modeling, and animation works supported the design and implementation processes.