Project Overview
Schlumberger WesternGeco Saudi Arabia Ltd. The Dammam Land Rig Yard Production Center Phase 1 Project carried out in Dammam, Saudi Arabia has been successfully completed as part of large-scale site preparation and ground improvement works.
Client
Schlumberger WesternGeco Saudi Arabia Ltd.
Project Area
153.000 m2
Start Date
May 21, 2018
Finish Date
Aug 21, 2018




Dammam Land Rig Yard Production Center Phase 1 Project
Schlumberger WesternGeco Saudi Arabia Ltd. The Dammam Land Rig Yard Production Center Phase 1 Project carried out in Dammam, Saudi Arabia has been successfully completed as part of large-scale site preparation and ground improvement works.
Employer: Schlumberger WesternGeco Saudi Arabia Ltd.
Project Description: Dammam Land Rig Yard Production Center – Phase 1
Location: Dammam, Saudi Arabia
Scope of Work: Soil Improvement (RIC), Site Preparation and Grading
Application Area: 153,000 m²
Start Date: May 2018
Completion Date: August 2018
Schlumberger WesternGeco – Dammam Land Rig Yard Production Center (Phase 1)
Schlumberger WesternGeco Saudi Arabia Ltd. The Dammam Land Rig Yard Production Center Phase 1 Project carried out in Dammam, Saudi Arabia has been successfully completed as part of large-scale site preparation and ground improvement works.
Within the scope of the project, 153,000 m² of soil improvement (RIC – Rapid Impact Compaction) and site preparation and leveling works were carried out. The applications, designed in accordance with industrial use and heavy-load operations, were implemented with the objective of achieving high-strength and long-lasting ground performance.
The works were completed between 21 May 2018 – 21 August 2018, in compliance with international quality, occupational health and safety, and environmental standards.