Project Overview

3M Manufacturing Co. The Manufacturing Facility Project implemented in Dammam, Saudi Arabia has been successfully completed on a turnkey basis, including comprehensive infrastructure, civil, architectural, mechanical, and electrical installation works.

Client

3M Manufacturing Co.

Project Area

8.650 m2

Start Date

Aug 28, 2016

Finish Date

Aug 31, 2017

3M Manufacturing Co. Production Facility

3M Manufacturing Co. The Manufacturing Facility Project implemented in Dammam, Saudi Arabia has been successfully completed on a turnkey basis, including comprehensive infrastructure, civil, architectural, mechanical, and electrical installation works.

Employer: 3M Manufacturing Co.
Project Description: Manufacturing Facility
Location: Dammam, Saudi Arabia
Scope of Work: Turnkey; Infrastructure, Civil, Architectural, Electrical and Mechanical Installation
Structural System: Production buildings: Steel Structure / Administrative building: Reinforced Concrete
Total Enclosed Area: 8,650 m²
Start Date: August 2016
Completion Date: August 2017
Design: Concept Design: Arcadis / Hyder Group
Architectural: K2 Architecture
Structural: Cihan Kütük
Mechanical: RK Engineering
Electrical: Akyaz Engineering

3M Manufacturing Co. Production Facility Project | Turnkey Project

3M Manufacturing Co. The Manufacturing Facility Project implemented in Dammam, Saudi Arabia has been successfully completed on a turnkey basis, including comprehensive infrastructure, civil, architectural, mechanical, and electrical installation works.

In the project with a total enclosed area of 8,650 m², production and administrative functions were addressed with different structural systems. Steel structures were used in the production buildings, while a reinforced concrete structural system was used in the administrative building, prioritizing operational efficiency and structural durability.

The project was completed between August 2016 – August 2017, in accordance with the planned schedule and quality standards. The concept design was prepared by Arcadis / Hyder Group, the architectural design by K2 Architecture, the structural projects by Cihan Kütük, the mechanical installation by RK Engineering, and the electrical installation by Akyaz Engineering.