Project Overview

The production facility project developed for Aykut Acarer in Kapaklı Organized Industrial Zone (OSB), Tekirdağ, was planned as a turnkey project covering all processes from infrastructure to superstructure.

Client

Aykut Acarer

Project Area

9.024 m2

Start Date

Oct 1, 2025

Finish Date

Apr 15, 2026

Aykut Acarer Production Infrastructure and Superstructure Construction Works

The production facility project developed for Aykut Acarer in Kapaklı Organized Industrial Zone (OSB), Tekirdağ, was planned as a turnkey project covering all processes from infrastructure to superstructure.

Client: Aykut Acarer
Project Description: Aykut Acarer Production Infrastructure and Superstructure Construction Works
Location: Kapaklı Organized Industrial Zone, Tekirdağ
Scope of Work: Turnkey; Infrastructure, Construction, Architectural, Electrical and Mechanical Works
Structural System: Precast Concrete Structural System
Total Covered Area: 9,024 m²
Start Date: October 2025
Completion Date: March 2026
Design: Fields Architecture and Industrial Design

Aykut Acarer Production Facility Project

The production facility project developed for Aykut Acarer in Kapaklı Organized Industrial Zone (OSB), Tekirdağ, was planned as a turnkey project covering all processes from infrastructure to superstructure.

The project, with a total enclosed area of 9,024 m², includes infrastructure, construction, architectural, electrical, and mechanical installation works carried out with an integrated approach. The structure utilizes a precast concrete structural system to create a durable and efficient industrial facility suitable for production processes.

The project works are scheduled to be completed between October 2025 – March 2026 in accordance with the planned schedule and quality standards. Architectural and industrial design works have been prepared by Fields Architecture & Industrial Design.