Project Overview

The Frito-Lay Potato Snack Food Production Plant Extension Project, developed for Saudi Snack Foods Co. Ltd. (PepsiCo) in the 2nd Industrial Area, Dammam, Saudi Arabia, is being executed on a turnkey basis, including comprehensive infrastructure, construction, architectural, electrical, and mechanical works.

Client

Saudi Snack Foods Co. Ltd. (PepsiCo)

Project Area

4.865 m2

Start Date

Jan 1, 2024

Finish Date

Oct 31, 2024

Frito-Lay Potato Snack Food Production Plant Extension

The Frito-Lay Potato Snack Food Production Plant Extension Project, developed for Saudi Snack Foods Co. Ltd. (PepsiCo) in the 2nd Industrial Area, Dammam, Saudi Arabia, is being executed on a turnkey basis, including comprehensive infrastructure, construction, architectural, electrical, and mechanical works.

Client: Saudi Snack Foods Co. Ltd. (PepsiCo)
Project Description: Frito-Lay Potato Snack Food Production Plant Extension
Location: 2nd Industrial Area, Dammam, KSA
Scope of Work: Turnkey; Infrastructure, Construction, Architectural Works, Electrical and Mechanical Works
Structural System: Steel Structure
Total Covered Area: 4,865 m²
Start Date: January 2024
Completion Date: October 2024
Design: TEM Engineering

Frito-Lay Potato Snack Food Production Plant Extension | Turnkey Project

The Frito-Lay Potato Snack Food Production Plant Extension Project, developed for Saudi Snack Foods Co. Ltd. (PepsiCo) in the 2nd Industrial Area, Dammam, Saudi Arabia, is being executed on a turnkey basis, including comprehensive infrastructure, construction, architectural, electrical, and mechanical works.

The project, with a total enclosed area of 4,865 m², includes fully implemented production and support areas as well as complete technical infrastructure. The facility utilizes a steel structural system to create a highly efficient and durable plant.

The project is scheduled to be completed between January 2024 – October 2024 in accordance with the planned schedule and quality standards. The design has been prepared by TEM Engineering.

  • Gum and Candy Manufacturing Plants

  • Dammam Land Rig Yard Production Facility – Phase 1