Project Overview

For BSH Ev Aletleri San. ve Tic. A.Ş., the Warehouse and Logistics Facilities Project implemented in Çerkezköy Organized Industrial Zone, Tekirdağ was successfully completed on a turnkey basis, including comprehensive infrastructure and superstructure works.

Client

BSH Ev Aletleri San. ve Tic. A.Ş.

Project Area

44.120 m2

Start Date

May 23, 2011

Finish Date

Mar 30, 2012

BSH Warehouse and Logistics Facilities

For BSH Ev Aletleri San. ve Tic. A.Ş., the Warehouse and Logistics Facilities Project implemented in Çerkezköy Organized Industrial Zone, Tekirdağ was successfully completed on a turnkey basis, including comprehensive infrastructure and superstructure works.

Employer: BSH Ev Aletleri San. ve Tic. A.Ş.
Project Description: Warehouse Building, Access Roads, Container Area, Railway Line, Stream Rehabilitation
Location: Çerkezköy Organized Industrial Zone, Tekirdağ
Scope of Work: Turnkey; Infrastructure, Construction, Architectural, Electrical and Mechanical Installation Works
Structural System: Prefabricated Columns, Space Roof Structure
Total Enclosed Area: 44,120 m²
Start Date: May 2011
Completion Date: December 2012
Design: Ateş Architecture, Engineering

BSH Home Appliances Warehouse and Logistics Facilities Project | Turnkey

For BSH Ev Aletleri San. ve Tic. A.Ş., the Warehouse and Logistics Facilities Project implemented in Çerkezköy Organized Industrial Zone, Tekirdağ was successfully completed on a turnkey basis, including comprehensive infrastructure and superstructure works.

In the project with a total enclosed area of 44,120 m², in addition to the warehouse building construction, works including access roads, container area, railway line, and stream rehabilitation were carried out. A durable and efficient facility suitable for high-volume storage and logistics operations was created using prefabricated columns and a space roof system.

Within the scope of the project, infrastructure, construction, architectural applications, and electrical and mechanical installation works were completed with an integrated approach. The works were carried out between May 2011 – December 2012 in accordance with the planned schedule and quality standards. The design works were prepared by Ateş Architecture, Engineering.