Project Overview
Baykar Makine A.Ş. The R&D and Production Center Project implemented in line with advanced technology development and manufacturing requirements has been successfully completed on a turnkey basis, including infrastructure, architectural works, reinforced concrete–steel structures, electrical and mechanical works.
Category
Client
Baykar Makine A.Ş.
Project Area
27.707 m2
Start Date
Sep 26, 2016
Finish Date
Jul 26, 2017




Baykar R&D and Production Center
Baykar Makine A.Ş. The R&D and Production Center Project implemented in line with advanced technology development and manufacturing requirements has been successfully completed on a turnkey basis, including infrastructure, architectural works, reinforced concrete–steel structures, electrical and mechanical works.
Employer: Baykar Makine A.Ş.
Project Description: R&D and Production Center
Location:
Scope of Work: Turnkey; Infrastructure Works, Architectural Works, Reinforced Concrete–Steel Works, Electrical and Mechanical Works
Structural System: Reinforced Concrete & Steel Structure
Total Enclosed Area: 27,707 m²
Start Date: September 2016
Completion Date: July 2017
Design: Architectural: SE Architecture & Etüd Architecture
Structural: Nodus Engineering
Mechanical: Beta Teknik
Electrical: Atlantis Electrical
Baykar R&D and Production Center Project | Turnkey Project
Baykar Makine A.Ş. The R&D and Production Center Project implemented in line with advanced technology development and manufacturing requirements has been successfully completed on a turnkey basis, including infrastructure, architectural works, reinforced concrete–steel structures, electrical and mechanical works.
In the project with a total enclosed area of 27,707 m², R&D laboratories, production areas, and support units were constructed in accordance with high security and performance criteria. The facility was built using a reinforced concrete and steel structural system, targeting flexible usage, structural strength, and long-lasting performance.
The project was completed between September 2016 – July 2017, in accordance with the planned schedule and quality standards. The architectural design was prepared by SE Architecture & Etüd Architecture, structural projects by Nodus Engineering, mechanical installation by Beta Teknik, and electrical installation by Atlantis Electrical.