Project Overview
C. Steinweg Levant Lojistik Hiz. San. ve Tic. A.Ş. The Logistics Center Project implemented for logistics and warehousing operations has been successfully completed on a turnkey basis, including infrastructure, civil, architectural, electrical, and mechanical works.
Category
Client
C. Steinweg Levant Lojistik Hiz. San. Ve Tic. AŞ
Project Area
8.600 m2
Start Date
Apr 15, 2018
Finish Date
Nov 30, 2018
C. Steinweg Levant Logistics Center
C. Steinweg Levant Lojistik Hiz. San. ve Tic. A.Ş. The Logistics Center Project implemented for logistics and warehousing operations has been successfully completed on a turnkey basis, including infrastructure, civil, architectural, electrical, and mechanical works.
Employer: C. Steinweg Levant Lojistik Hiz. San. Ve Tic. A.Ş.
Project Description: Logistics Center
Location:
Scope of Work: Turnkey; Infrastructure Works, Civil Works, Architectural Works, Electrical and Mechanical Works
Structural System: Reinforced Concrete
Total Enclosed Area: 8,600 m²
Start Date: April 2018
Completion Date: November 2018
Design: Fields Studio
C. Steinweg Levant Logistics Center Project | Turnkey Project
C. Steinweg Levant Lojistik Hiz. San. ve Tic. A.Ş. The Logistics Center Project implemented for logistics and warehousing operations has been successfully completed on a turnkey basis, including infrastructure, civil, architectural, electrical, and mechanical works.
In the project with a total enclosed area of 8,600 m², warehouse areas, operational spaces, and support units were constructed with a functional and efficient approach. The facility was built using a reinforced concrete structural system, resulting in a durable and long-lasting logistics center.
The project was completed between April 2018 – November 2018, in accordance with the planned schedule and quality standards. The design works were prepared by Fields Studio.