Project Overview

For Clariant Türkiye Boya ve Kimyevi Maddeler San. ve Tic. A.Ş., the Administrative Building and Masterbatch Production Facility constructed in Gebze Organized Industrial Zone was successfully completed by our company on a turnkey basis.

Client

Clariant Türkiye Boya ve Kimyevi Maddeler San. ve Tic. A.Ş.

Project Area

10.900 m2

Start Date

Mar 21, 2011

Finish Date

Oct 3, 2011

Clariant Masterbatch Production Facility

For Clariant Türkiye Boya ve Kimyevi Maddeler San. ve Tic. A.Ş., the Administrative Building and Masterbatch Production Facility constructed in Gebze Organized Industrial Zone was successfully completed by our company on a turnkey basis.

Employer: Clariant Türkiye Boya ve Kimyevi Maddeler San. ve Tic. A.Ş.
Project Description: Administrative Building and Masterbatch Production Building Construction
Location: Gebze Organized Industrial Zone, Kocaeli
Scope of Work: Turnkey; Infrastructure, Construction, Architectural, Electrical and Mechanical Installation Works
Structural System: Reinforced Concrete, Prefabricated Columns, Space Frame System, Steel
Total Enclosed Area: 10,900 m²
Start Date: March 2011
Completion Date: October 2011
Design: Lim Architecture, Engineering / Alaz Albay

Clariant Türkiye Administrative Building and Masterbatch Production Facility | Turnkey

For Clariant Türkiye Boya ve Kimyevi Maddeler San. ve Tic. A.Ş., the Administrative Building and Masterbatch Production Facility constructed in Gebze Organized Industrial Zone was successfully completed by our company on a turnkey basis.

In the project with a total enclosed area of 10,900 m², infrastructure, construction, architectural works, and electrical and mechanical installation works were carried out. A durable and functional industrial facility suitable for production processes was constructed using reinforced concrete, prefabricated columns, space frame system, and steel structural systems.

The project was completed between March 2011 – October 2011 in accordance with the planned schedule and quality standards. The design works were prepared by Lim Architecture, Engineering / Alaz Albay.