For Jotun Boya Sanayi ve Ticaret A.Ş., the Çerkezköy Additional Production Facilities Project implemented in Çerkezköy Organized Industrial Zone, Tekirdağ was successfully completed as part of infrastructure, construction, and architectural works.
Category
Client
Jotun Boya Sanayi ve Ticaret A.Ş.
Project Area
2912 m2
Start Date
Jun 1, 2006
Finish Date
Dec 31, 2006




Jotun Additional Production Facilities
For Jotun Boya Sanayi ve Ticaret A.Ş., the Çerkezköy Additional Production Facilities Project implemented in Çerkezköy Organized Industrial Zone, Tekirdağ was successfully completed as part of infrastructure, construction, and architectural works.
- Employer: Jotun Boya Sanayi ve Ticaret A.Ş.
- Project Description: Çerkezköy Additional Production Facilities
- Location: Çerkezköy Organized Industrial Zone, Tekirdağ
- Scope of Work: Infrastructure Works, Construction Works, Architectural Works
- Structural System: Warehouse: Prefabricated Structure, Production Building: Reinforced Concrete
- Total Enclosed Area: 2,912 m²
- Start Date: June 2006
- Completion Date: December 2006
- Design: UMO Architecture
Jotun Çerkezköy Additional Production Facilities Project
For Jotun Boya Sanayi ve Ticaret A.Ş., the Çerkezköy Additional Production Facilities Project implemented in Çerkezköy Organized Industrial Zone, Tekirdağ was successfully completed as part of infrastructure, construction, and architectural works.
In the project with a total enclosed area of 2,912 m², buildings for storage and production functions were constructed. A prefabricated structure was used for the warehouse building, while a reinforced concrete structural system was used for the production building, prioritizing operational efficiency and structural durability.
The project was completed between June 2006 – December 2006 in accordance with the planned schedule and quality standards. The design was prepared by UMO Architecture.