Project Overview

AKS Sistem A.Ş. The Production, Warehouse and Administrative Buildings Project implemented in the Çerkezköy Organized Industrial Zone has been successfully completed on a turnkey basis, including comprehensive infrastructure, civil, architectural, mechanical, and electrical installation works.

Client

AKS Sistem A.Ş.

Project Area

35.000 m2

Start Date

May 5, 2017

Finish Date

Mar 21, 2018

AKS Sistem Production, Warehouse, and Administrative Buildings

AKS Sistem A.Ş. The Production, Warehouse and Administrative Buildings Project implemented in the Çerkezköy Organized Industrial Zone has been successfully completed on a turnkey basis, including comprehensive infrastructure, civil, architectural, mechanical, and electrical installation works.

Employer: AKS Sistem A.Ş.
Project Description: Construction of Production, Warehouse and Administrative Buildings
Location: Çerkezköy Organized Industrial Zone
Scope of Work: Turnkey; Infrastructure, Civil Works, Architectural Works, Mechanical Installation, Electrical Installation
Structural System: Production Building: Reinforced Concrete and Space Frame Roof System / Administrative Buildings: Reinforced Concrete
Total Enclosed Area: 35,000 m²
Start Date: May 2017
Completion Date: March 2018
Design: Architectural: Alaz Albay Architecture
Structural: Yıldız Engineering
Mechanical: RK Engineering
Electrical: Akyaz Engineering

AKS Sistem Production, Warehouse and Administrative Buildings Project | Turnkey Project

AKS Sistem A.Ş. The Production, Warehouse and Administrative Buildings Project implemented in the Çerkezköy Organized Industrial Zone has been successfully completed on a turnkey basis, including comprehensive infrastructure, civil, architectural, mechanical, and electrical installation works.

In the project with a total enclosed area of 35,000 m², production, storage, and administrative functions were handled with an integrated approach. In the production building, a reinforced concrete structural system and space frame roof system were utilized, while a reinforced concrete structural system was used in the administrative buildings, resulting in wide-span, durable, and functional structures.

The project was completed between May 2017 – March 2018, in accordance with the planned schedule and quality standards. The architectural design was prepared by Alaz Albay Architecture, structural projects by Yıldız Engineering, mechanical installation by RK Engineering, and electrical installation by Akyaz Engineering.