Project Overview

For KCC Boya Sanayi ve Ticaret A.Ş., the Paint Production Facility and Administrative Building project constructed in Gebze Organized Industrial Zone was successfully completed by our company on a turnkey basis.

Client

KCC Boya Sanayi ve Ticaret A.Ş.

Project Area

15.500 m2

Start Date

Aug 1, 2007

Finish Date

Apr 25, 2008

KCC Paint Production Facility

For KCC Boya Sanayi ve Ticaret A.Ş., the Paint Production Facility and Administrative Building project constructed in Gebze Organized Industrial Zone was successfully completed by our company on a turnkey basis.

Employer: KCC Boya Sanayi ve Ticaret A.Ş.
Project Description: Paint Production Facility and Administrative Building
Location: Gebze Organized Industrial Zone, Izmit
Scope of Work: Turnkey; Infrastructure, Construction, Architectural, Electrical and Mechanical Installation Works
Structural System: Reinforced Concrete
Total Enclosed Area: 15,500 m²
Start Date: August 2007
Completion Date: April 2008
Design: Seyaş Architecture, Engineering / Alaz Albay

KCC Paint Production Facility and Administrative Building Project | Turnkey

For KCC Boya Sanayi ve Ticaret A.Ş., the Paint Production Facility and Administrative Building project constructed in Gebze Organized Industrial Zone was successfully completed by our company on a turnkey basis.

In the project with a total enclosed area of 15,500 m², infrastructure, construction, and architectural works, as well as electrical and mechanical installation works were carried out. A durable and long-lasting industrial facility suitable for production processes was constructed using a reinforced concrete structural system.

The project was delivered between August 2007 – April 2008 in accordance with the planned schedule and quality standards. The design was prepared by Seyaş Architecture, Engineering / Alaz Albay.